Short answer: size the conductors to at least 115% of the generator’s nameplate current, then check voltage drop over the run length and upsize if it exceeds 3%. For a typical 22kW air-cooled unit at 240V, that usually lands on #2 AWG copper — but the nameplate on your unit decides it, not the kW on the box.
Start with nameplate amps, not kilowatts
Everyone shops generators by kilowatts. Conductors get sized by amps. Those are not the same conversation, and this is where most DIY installs go wrong.
Divide watts by volts. A 22kW unit at 240V single phase is pulling roughly 92 amps continuous. An 18kW is about 75 amps. A 14kW is about 58. Your actual nameplate may differ slightly by model and fuel — natural gas derates below propane on most air-cooled units — so read the plate on the unit in front of you.
Then apply the 115% rule
NEC 445.13 requires that conductors carrying generator output be rated at not less than 115% of the nameplate current rating. That margin exists because a generator can run at full output for hours during an outage, and because the set can deliver more than its continuous rating during motor starting.
So the 22kW at 92 amps needs conductors good for about 106 amps, not 92.
Typical starting points, copper THWN-2 at 75°C
| Unit | Approx. amps | ×115% | Typical copper |
|---|---|---|---|
| 14kW | 58 A | 67 A | #4 AWG |
| 18kW | 75 A | 86 A | #3 AWG |
| 22kW | 92 A | 106 A | #2 AWG |
| 26kW | 108 A | 125 A | #1 AWG |
Treat this as a starting point, not a specification. Ambient temperature, number of current-carrying conductors in the raceway, and your unit’s actual nameplate all move these numbers. Your AHJ has the final say.
The second test is run length
Ampacity tells you the wire will not overheat. It says nothing about whether the voltage still arrives usable at the other end.
Voltage drop is not a hard NEC requirement — it lives in the informational notes — but every inspector and every motor in the house cares about it. The working target is 3% or less on the feeder.
Under about 50 feet, the ampacity size is usually fine. Past roughly 100 feet, expect to go up a size. Past 150 feet, run the calculation properly before you buy wire — at that distance a 22kW install often moves to #1 or 1/0, and discovering that after the trench is open is an expensive afternoon.
Copper or aluminum
Aluminum costs noticeably less and is entirely code-legal for this feeder. The tradeoff is that aluminum carries less current per size, so you go up roughly two sizes — where copper wants #2, aluminum wants 1/0.
If you run aluminum, use terminations rated for it and apply antioxidant compound. Most of aluminum’s bad reputation comes from old branch-circuit wiring and poor terminations, not from properly installed modern AA-8000 series feeder.
What else is in that trench
The power conductors are not the only thing running between the generator and the transfer switch. You also need the control wiring that tells the transfer switch the generator is ready — typically a multi-conductor low-voltage cable, and the specific requirement is set by your transfer switch model.
Plan the raceway for both. Pulling control wire into a conduit sized only for the feeder is a miserable job.
What happens if the conductors are undersized
Nothing dramatic on day one. That is the problem.
Undersized conductors run hot under sustained load, degrade insulation over years, and drop enough voltage that motor loads — your air conditioner compressor, well pump, furnace blower — draw extra current to compensate and run hot themselves. The failure shows up during a long outage, which is precisely when you need the system.
It also fails inspection, and the fix is replacing the entire run.
Quick recap
- Read nameplate amps off the unit — not the kW rating
- Multiply by 1.15 to get required ampacity
- Check voltage drop over your actual run; upsize past ~100 ft
- Aluminum is fine, roughly two sizes up, with rated terminations
- Size the raceway for control wiring too
- Confirm everything with your AHJ before the trench closes
Order the generator and the wire together
Measure the run before you order. Buying the generator and coming back for conductors a week later usually means a second freight charge and a stalled install. We stock wire and cable alongside home standby generators — and if you tell us the model and the distance, we will tell you what to pull.